DATACENTERPORT

Data Center Design File

Data center design for small businesses — in minutes.

Answer eight questions. Get UPS, battery, genset, rack, PDU and cooling sizing, a 3D room view and a vendor-neutral bill of materials.

3D room view of the sample project: three racks, UPS, battery, panel and two cooling units
Sample project: Head Office · real calculation output

How it works

  1. Answer 8 questions

    Pick your devices from the list or enter the total load in kW; backup time, mains supply and room.

  2. Upload a specification (optional)

    Values are read from a PDF, Word or Excel specification; you confirm them.

  3. Get your design file

    Sizing, rack layout, 3D view and bill of materials, as PDF, Word and Excel.

What you get

  • Sizing

    UPS, battery and genset; every value with its rule and standard.

  • Rack layout

    Front view: U-by-U placement, heavy devices at the bottom, A+B PDUs.

  • 3D room view

    Racks, aisles, UPS, battery, panel and cooling units in the room.

  • Bill of materials (no prices)

    Vendor-neutral items with quantity and specification.

  • PDF, Word, Excel

    Summary and detailed PDF, editable Word, Excel bill of materials.

  • TR / EN / DE outputs

    The document language follows the country and can be changed.

Based on
  • EN 50600
  • IEC 62040
  • ASHRAE TC 9.9
  • VDE 0100
  • BS 7671